JavaScript is required

Single FETs, MOSFETs AOWF14N50 Alpha and Omega Semiconductor, Inc.

Images are for reference only
Free Sample Requesting
Free Sample Requesting
Part Number:
AOWF14N50
Manufacturer:
Alpha and Omega Semiconductor, Inc.
Category:
Single FETs, MOSFETs
Description:
MOSFET N-CH 500V 14A TO262F
Series
-
Package
Tube
Package/Case:
TO-262-3 Long Leads, I2PAK, TO-262AA
RoHS:
RoHS CompliantRoHS Compliant
Downloads:
Alpha and Omega Semiconductor, Inc. AOWF14N50 is available from PCBEKEY and can be delivered to most parts of the world within 5-7 days, with a 1-year warranty and a 30-day return policy. If you need to order in large quantities, please contact sales@pcbekey.com for a quote.

Specifications

Alpha and Omega Semiconductor, Inc. AOWF14N50 technical specifications, attributes, parameters and parts with similar specifications to Alpha and Omega Semiconductor, Inc. AOWF14N50.

Category
Manufacturer
Product Status
Obsolete
FET Type
N-Channel
Technology
MOSFET (Metal Oxide)
Drain to Source Voltage (Vdss)
500 V
Current - Continuous Drain (Id) @ 25°C
14A (Tc)
Drive Voltage (Max Rds On, Min Rds On)
10V
Rds On (Max) @ Id, Vgs
380mOhm @ 7A, 10V
Vgs(th) (Max) @ Id
4.5V @ 250µA
Gate Charge (Qg) (Max) @ Vgs
51 nC @ 10 V
Vgs (Max)
±30V
Input Capacitance (Ciss) (Max) @ Vds
2297 pF @ 25 V
Power Dissipation (Max)
28W (Tc)
Operating Temperature
-55°C ~ 150°C (TJ)
Mounting Type
Through Hole
Supplier Device Package
TO-262F
Package / Case
TO-262-3 Long Leads, I2PAK, TO-262AA
Shopping Guide
Shipping Rate
Shipping Rate

We ship orders once a day around 5 p.m., except Sunday. Once shipped, the estimated delivery time depends on the courier company you choose, usually 5-7 working days.

Shipping Methods
Shipping Methods

We provide DHL, FedEx, UPS, EMS, SF Express, and Registered Air Mail international shipping.

Shipping Methods
Payment
Payment

TT in advance (bank transfer), Western Union,PayPal. Customer is responsible for shipping fee, bank charges, duties and taxes.

Payment

AOWF14N50 Guarantees

Service Guarantees
Service Guarantees

We guarantee 100% customer satisfaction.

Our experienced sales team and tech support team back our services to satisfy all our customers.

Quality Guarantees
Quality Guarantees

We provide 90 days warranty. If the items you received were not in perfect quality, we would be responsible for your refund or replacement, but the items must be returned in their original condition.

Safe & Secure
Safe & Secure

100% Safe & Secure Checkout and Payment Options. We believe that your trust is our most valuable asset, and we are committed to safeguarding your personal and financial information.